Specifications include, but are not limited to: The work to be done consists of furnishing all labor, equipment, tools, materials and supervision to construct approximately 400 lineal feet of eight (8) inch diameter ductile iron waterline along Culbertson Drive, which includes one creek crossing. The work will include excavation, disposal of excess excavation, waterline pipe, dewatering (if necessary), pipe zone material, backfill, connecting to existing water mains, waterline creek crossing, including approximately 30 lineal feet of 18-inch diameter steel casing and pipe supports at each wing wall, surface restoration, valves, fittings, thrust restraint, compaction, pressure and bacteriological testing, erosion control, traffic control, and miscellaneous work and appurtenances.