Specifications include, but are not limited to: The Oregon Military Department (OMD) seeks to repair the parking lot at the Central Oregon Readiness Center (CORC). Depending on the condition of the existing asphalt concrete, portions of the parking lot will require full reconstruction, removal and replacement of the asphalt concrete portion, or sealant. Cost to completely remove existing material up to 6 inches below the bottom of the existing base rock then replaced with crushed aggregate base; Cost to remove additional material beyond 6 inches below the bottom of existing base rock, described in Unit Price No. 1, Over Excavation, and then replace with crushed aggregate base over; Cost to reconstruct area as described in geotechnical report section 3.1.3, Reconstruction.