Specifications include, but are not limited to: The 128TH STREET CULVERT IMPROVEMENT shall include: x Approximately 130 LF of Trenchless 24” RCP x Approximately 40 LF of 48” RCP x Approximately 45 SY of 6” Trail Pavement x Approximately 65 SY of 9” PCC pavement x Related items including removals, restoration, traffic control, erosion control, and survey. 4.01 Storm Sewer, Trenchless, 24" RCP LF 119.0; 4.02 Storm Sewer, Trenched, 48" RCP LF 47.0; 4.03 Removal of Storm Sewer, RCP, 30" LF 81.0; 4.04 Removal of Storm Sewer, RCP Apron, 30" EA 2.0; 4.05 Pipe Apron, RCP, 48" EA 1.0; 4.06 Footing for Concrete Pipe Apron, 48" EA 1.0; 4.07 Concrete Apron Guard, 48" EA 1.0; 6.01 Manhole, SW-402, 4'x15' Cast in Place, Mod. EA 1.0; 6.02 Removal, Manhole, SW-402, 4'x12' EA 1.0; 7.01 Pavement, Non-Reinforced, PCC, 9" C4 SY 63.8;