Specifications include, but are not limited to: 1. Provide programming services: a. Coordinate with the OWNER to provide written control strategies for all Programmable Logic Controller (PLC) programming for the project. Coordinate with the OWNER and Variable Frequency Drive (VFD) Manufacturer to provide a comprehensive list of ProfiNET data to be transmitted between VFDs and PLCs. b. Provide all PLC programming services required for the implementation of the installation of new VFDs. Modify existing PLC programming at a minimum for PCM-100, located in Headworks Pump Room, PCM-1000, located in Solids Handling Building ,and PCM-1400, located in RAS-1 Pump Station. Program new PLCs PCM-1500, located in RAS-2 Pump Station and HW-P2, HW-P3, HW-P4, HW-P5, HW-P6, and HW-P7 Control Sections PLCs, located in Headworks Pump Room. c. Programming services for the plant Human Machine Interface (HMI) system will be performed by the OWNER. 2. Control panel fabrication: a. Design, fabricate, and fully test new PLC control panels PCM-1500, located in RAS-2 Pump Station, and HW-P2, HW-P3, HW-P4, HW-P5, HW-P6, HW-P7 Control Sections, total of six control panels located in Headworks Pump Room. 3. Construction related services: a. Modify existing PLC control panels PCM-100, located in Headworks Pump Room, PCM-110, located in Headworks Pump Room, and PCM-1400 located in RAS-1 Pump Station to meet the requirements of the VFD replacement: b. Installation of new PLC panels and termination of field wiring will be by Others. Provide construction support during control panel installation, control panel commissioning and testing, VFD commissioning and testing. c. Provide support and coordination with OWNER's HMI programming efforts.