All correspondence must be made through the Vendor Portal. Specifications include, but are not limited to: • Obtain the City Permits from the City of Brookhaven offices. • Obtain the Dekalb County Permits from Dekalb County offices. • Pick up Dekalb County Sewer Approval from the County Sewer and Water offices. • Coordinate with the Owner’s Representative to have the city pay utility, tap, and impact fees directly to the City of Brookhaven or Dekalb County utility departments. • Secure any other permits necessary for building the project and utilities. • Submit a construction sequencing process and traffic control plan for city review. • Construction stakeout and field location adjustments in conjunction with the Owner. • Removal of in-place security fences and erosion control fences left from previous project. • Installation and maintenance of 6’ chain-link project security and tree protection fencing. • Installation and maintenance of erosion control measures. • Field adjustments of the erosion control and substitutions of silt sock and fence. • Coordination with City arborist for prescriptive tree care of trees designated to remain. • Remove marked trees and undergrowth within limits of disturbance. • Tree protection of critical trees and root plates on site with city arborist. • Hand cutting and removal of trees in the 25’ State Buffer on the lake leaving stumps. • Demolition and re-construction of a Dekalb County Sewer Line • Coordination with Georgia Power to remove site trail lights and power lines. • Site demolition of an existing parking lot, curbs, and drainage structures. • Removal and capping of abandoned utility lines and meters on site. • Grading the designated project areas. • Removal, storage, and protection of existing granite curbs for reinstallation. • Installation of new and salvaged granite curbs • Install storm drainage system, structures, and pipes. • Install sanitary sewer, grease trap, and drain lines connections to the Lake House • Install water service, power line and gas line complete with connections to Lake House • Coordinate with utility providers for required services. • Install quick coupler water irrigation system. • Construction of the 4000 sf Lake House structure and two (2) side Pavilions complete. • Construction of 3000 sf cantilevered outdoor sun deck with metal guard rails