Specifications include, but are not limited to: Paving will be on the following roads: 1. Forrest Drive (1,265’ cul-de-sac) – Shim and Overlay 2. Old Trestle Road (860’ cul-de-sac) – Reclaim asphalt; the Town will prep for paving, base coat, and topcoat. 3. Town Office parking lot – Milling, Shim, and Overlay 4. Sawyer Lane (172’ x 20’) – Shim and Overlay; Specifics: Forrest Drive is to be swept, tac oil applied, shimmed, and overlayed with 3/8” mix, 1 ½” thick. Old Trestle Road needs the first 90’ swept and tac oil applied, the remainder will be reclaimed. The Town Department of Public Works will prep for paving. Basecoat - ½” base 1 ½” thick. Topcoat - 3/8” top 1 ½” thick. Town Office parking lot to be milled 5’ away from the building along the back. The remaining pavement is to be swept and tac oil applied. Shim and overlay with 3/8” mix, 2” thick. Sawyer Lane to be swept and tac oil applied, shimmed, and overlayed with 3/8” mix. Overlay to be 2” thick. Estimated tons in place 1,200 +/-