Specifications include, but are not limited to: - Supply and install eight (8) 3-Ton Mini-Split systems with Heat Pumps. Mounting Brackets Condensate Pumps WIFI thermostats and adapters with Free remote access Refrigerant leak detection Warranty: labor/parts - Supply and install two (2) 3000 watt electric unit heaters Mounting brackets 21 seer Wall thermostats Warranty: 1 year labor/parts - Must also include ALL electrical work to include but not limited to: transformer 225 amp main 3 phase breakers in main service panel electrical panel for 8 mini splits and 2 heaters - If a service call is required, contractor must be able to respond within 1 business day after notification. - Contractor must supply own ladder if need for bid. - All disposal is the responsibility of the Contractor. Units will be installed at the following location: The Depot (Cleburne Railroaders Baseball Stadium)– 1906 Brazzle Blvd, Cleburne, TX76033