Specifications include, but are not limited to: 0005 201001-000 CLEARING AND GRUBBING LUMP SUM LUMP SUM _________._____ 0010 204001-000 MOBILIZATION LUMP SUM LUMP SUM _________._____ 0015 207001-001 UNCLASSIFIED EXCAVATION CY 796.000 _________._____ _________._____ 0020 207002-000 SUBGRADE CY 193.000 _________._____ _________._____ 0025 207034-000 FABRIC FOR SEPARATION SY 1,028.000 _________._____ _________._____ 0030 217001-000 SPECIAL ROCK FILL CY 21.000 _________._____ _________._____ 0035 307001-000 AGGREGATE BASE COURSE, CLASS I CY 182.000 _________._____ _________._____ 0040 307001-000 AGGREGATE BASE COURSE, CLASS 10 CY 31.000 _________._____ _________._____ 0045 408002-001 ASPHALT MATERIAL GA 16.000 _________._____ _________._____ 0050 415005-001 STANDARD MILLING SY 156.000 _________._____ _________._____ 0055 606025-004 6 INCH UNDERDRAIN PIPE LF 120.000 _________._____ _________._____ 0060 607001-001 TYPE 1 GUARDRAIL, CLASS 1 LF 25.000