All correspondence must be made through the Vendor Portal. Specifications include, but are not limited to: The Project consists of the design and construction of curb ramps at approximately 34 locations along WV 14, HARP 912, HARP 926, HARP 917, HARP 921, HARP 918, and CO 14/22 in Elizabeth, WV 14 in Mineral Wells, I-77 NB and SB Rest Areas to ensure ADA compliance. DOH intends to enter into a contract, which shall include but is not limited to: • Survey Services – no mapping will be supplied by the DOH • Right of Way Acquisition – All necessary plans and acquisition of right of way to construct the Project if deemed necessary • Project Services – preparation of construction plans as detailed in the Project Scope and shall include but are not limited to Design and Project Management;