All correspondence must be made through the Vendor Portal. 0005 204001-000 MOBILIZATION LUMP SUM LUMP SUM _________._____ 0010 211001-000 UNCLASSIFIED BORROW EXCAVATION CY 26,128.000 _________._____ _________._____ 0015 306001-001 RUBBLIZATION SY 188,580.000 _________._____ _________._____ 0020 408002-001 ASPHALT MATERIAL GA 17,771.000 _________._____ _________._____ 0025 410001-030 SUPERPAVE ASPHALT BASE CRSE, TY 19 SY 296,151.000 _________._____ _________._____ 0030 410007-060 SUPERPAVE ASPHALT SKID PVT, TY 12.5 SY 296,151.000 _________._____ _________._____ 0035 415005-001 STANDARD MILLING SY 296,151.000 _________._____ _________._____ 0040 601046-001 MODIFIED CONCRETE END POST EA 7.000 _________._____ _________._____ 0045 605012-001 ADJUST INLET TYPE, G EA 89.000 _________._____ _________._____ 0050 605020-001 INSTALL INLET GRATE, G EA 89.000 _________._____ _________._____ 0055 606020-001 AGGREGATE FILLED FABRIC UNDERDRAIN, LF 66,696.000 _________._____ _________._____ 0060 606025-002 4 INCH UNDERDRAIN PIPE LF 1,510.000