Specifications include, but are not limited to: The work to be done under this contract consists of furnishing all necessary labor, materials and equipment required for installing, upgrading, and implementing traffic signal technology, infrastructure, communication upgrades and provide central control. Locations include: 1 - Broad St at Water St & Wall St 2 - Broad St/Wash St at North St 3 - Washington St at Winter St 4 - Washington St at Bowen St 5 - Washington St at Claremont Plaza 6 - Washington St at Hannaford’s 7 - Washington St at Claremont Marketplace 8 - Washington St at Hobby Lobby/Petrin Heights Rd 9 - Washington St at Runnings 10 - Washington St at Home Depot The work also includes new traffic signal controllers, communication equipment, (including Ethernet switch and wireless broadband radios) video detection via single camera on all approaches, updated traffic signal timing plans, (including static plans based on traffic volume data) and traffic responsive plan based on real-time input. Application of peer-to-peer commands to enhance communication and operation along the corridor, maintenance of traffic, flaggers or uniformed police detail, erosion controls and other incidental items included in the contract documents. In addition to the improvements recommended above at each location, a central operating command center with computer is proposed at the Central Fire Station. This command center will provide remote traffic operational management and monitoring software with maintenance alert feature. Live monitoring of traffic through video detection camera feed will be provided at the central command center. The Contractor shall be responsible for the dismantling and removing of the existing controller, master controller, pedestrian push buttons, and existing loop detection amplifiers. All surplus equipment shall be salvaged and delivered to the City of Claremont Fire Department, within normal business hours. Surplus equipment that the Claremont FD does not wish to retain shall become the property of the Contractor and be disposed of offsite following local and state regulations.