Specifications include, but are not limited to: 1. Remove and replace existing hydronic piping including the underground hydronic piping between central plant and the Government Center and RTC building. 2. Provide a temporary system to maintain cooling and heating operations until system is successfully operational and can be turned over to Government Center and RTC buildings. Refer to sheet M0.6 for capacity. a. Include self-contained temporary air- cooled chiller with required pumps and appurtenances to maintain operating systems during replacement. Pumps shall be connected to building DP sensor to adjust VFD. 3. Chiller Replacement a. Remove and replace three (3) 500-ton chillers. b. Remove and replace all isolation valves of condenser and chilled water loops for each chiller. c. Remove and replace actuated valve and actuators on condenser and chilled water loops. d. Modify existing chilled water pipes for new chiller configuration. 4. Chilled Water Pump Replacement a. Remove and replace (3) chilled water pumps with bell and gossett pumps. b. Remove and replace chilled water pump variable frequency drives (VFD’s). c. Remove and replace all isolation valves, flow control/check valves and install temperature gauges at each chiller on condenser and chilled water loops. 5. Condenser Water Pump Replacement a. Three (3) 500-ton cooling towers and one (1) 650-ton cooling tower to remain. Existing VFD’s for each shall be removed and replaced. b. Remove and replace all existing condenser water piping, isolation valves, three (3) condenser water pumps, common header piping, and associated branch piping and all pressure and temperature devices. Four (4) existing sand separators to remain. c. Remove and replace existing VFD’s for existing pumps ‘VP-01,’ ‘VP-02,’ and ‘VP-03.’