Requesting quotes for a Ground Penetrating Radar with the following requirements:
Must be able to locate and mark:
- Metal utilities, including pipes and cables
- Non-metallic pipes, including PVC and asbestos cement
- Concrete storm and sewer systems
- Utilities where installed tracer wiring has failed
- Underground storage tanks and drainage tiles
- Septic system components
- Non-utility structures such as vaults, foundation walls and concrete pads
Must be able to penetrate to a depth of up to 26 ft with high resolution.
Must have an integrated GPS receiver for geo-referencing data.
Must be able to export geo-referenced data to .csv files.
Provide free interactive, online and on-demand courses on utility locating with GPR.
Award will be based on lowest price technically acceptable.
For questions contact SKC Mason Ferril at mason.s.ferril@uscg.mil.