Specifications include, but are not limited to: General • Provision of all labor, equipment, materials, and all services necessary for, and incidental to, the proper execution and completion of the tasks as described herein and in the Construction Documents; and, • Provision of a BPCA-approved Project construction schedule. Mobilization and Start-up • Performance of a visual survey of all Railings to verify existing conditions, quantities and dimensions; • Mobilization of all personnel, equipment and materials to the Project Site as needed. A laydown area for Projectrelated equipment and materials will be provided by BPCA in the vicinity of the Project Site; • Storage of all Project-related equipment and materials in the laydown area(s) provided by BPCA, or as otherwise directed by BPCA; • Installation of all NYC Department of Buildings-required construction fencing and signage, and securing of all permits required for performance of the Work; and, • Provision to BPCA of site safety and site maintenance plans, which plans are subject to review and approval by BPCA prior to commencement of the Work. Railing Replacement and Repair Work • Adherence to the procedures outlined in the Construction Documents to clean and prepare the Railings’ surfaces for repair painting; • Removal of deteriorated Railings, and replacement of such deteriorated Railings with new Railings in accordance with the Construction Documents; • Fabrication, furnishing and installation of required replacement Railings according to Drawing GA-4 of the Construction Documents, including but not limited to: • Perimeter of existing railing cleaning and painting. • Installation of new anchor bolts and lag bolts. • Furnishing and installation of new Railings attachment hardware, anchor bolts and lag bolts as needed; • Cleaning and preparation of all remaining Railings for painting; and, • Painting of all railings using three (3) part marine paint in accordance with the Construction Documents. Electrical Work • Verification of existing Project Site conditions as compared to that illustrated and/or described in the Construction Documents; • In coordination with BPCA’s Parks Department, shutdown, disconnection and safely turning off of all electrical services; • Removal of all existing lighting fixtures, wiring, and other Project Site elements affixed to the Railings (the “Affixed Elements”). Affixed Elements shall be salvaged in accordance with the Construction Documents, and stored off-site during construction in order to protect them from damage in coordination with BPCA’s designated third-party engineer for the Project, Urban Engineers of New York, D.P.C. (the “Project Design Engineer”). The Project Design Engineer will coordinate with the Contractor and provide direction as to which, if any, of the Affixed Elements are suitable for reuse and reattachment to the refinished and replaced Railings. Any Affixed Elements not so used will be appropriately disposed of by Contractor; and, • Adherence to the procedures outlined in the Construction Documents to repair or replace all wires, cables, conduits, raceways, fixtures, grounding conductors, and other items listed in the Construction Documents.