Specifications include, but are not limited to: The STATE OF MONTANA, Department of Natural Resources and Conservation (hereinafter referred to as “the State”) is soliciting bids for Jellison Fish Passage Replacements project. 1. Complete work affecting a streambed or stream bank in an expeditious manner to avoid unnecessary impacts to the stream. 2. Limit the clearing of vegetation to that which is absolutely necessary for construction of the project. Take precautions to preserve existing riparian vegetation. Salvage and reuse native vegetation where possible. 3. Install and maintain erosion control measures where appropriate to protect aquatic resources. Do not clear and grub land adjacent to streams prior to installing proper erosion and sedimentation controls. Conduct all work in a manner that minimizes turbidity and other disturbances to aquatic resources. 4. Plan temporary construction facilities to: a. Minimize disturbance to stream banks, stream bank vegetation, and the streambed by locating staging or storage facilities at least 50’ horizontally from the highest anticipated water level during construction; b. not restrict or impede fish passage in streams; and c. not restrict any flow anticipated during use. 5. Provide sediment controls for drainage from topsoil stockpiles, staging areas, access roads, channel changes, and instream excavations. 6. Isolate work zones from flowing and standing waters to prevent turbid water and sediments from being discharged into streams or other drainages that flow directly into the stream. Divert flowing waters around the work zone. 7. Do not spill or dump material into streams. Store and handle petroleum products, chemicals, cement and other deleterious materials in a manner that will prevent their entering streams. Site 1. Replacement of an existing 24” x 30’ perennial stream crossing CMP with a 48” x 38’ CMP . Site 2. Replacement of an existing 42” x 35’ perennial stream crossing CMP with a 72” x 48’ CMP . Site 3. Replacement of an existing 42” x 33’ perennial stream crossing CMP with a 72” x 40’ CMP . Site 4. Haul and installation of 20 cy of talus rock armoring at existing crossing on Swede Creek.