Specifications include, but are not limited to: Contractor shall a. Remove and reinstall existing door units and all new trim to a height that allows the doors to clear the new flooring. b. Install new flooring under the door threshold at the 3' front and end doors and the 6' back door. c. Install approximately 1,775 square feet of Marazzi Montagna Rustic Bay 6" x 24" glazed porcelain floor tile. d. Install any base boards that might be necessary. e. Install new base shoe (approx. 500 lin. ft.) and paint to match existing base boards. 3. Contractor shall construct any and all construction safety barriers to keep bystanders out of work areas and at a safe distance for the duration of the project. 4. Contractor shall do everything in their power to prevent unnecessary damage to any part of the building. 5. Contractor shall be responsible for any and all post-project clean up. 6. Contractor shall remove all debris (including nails and metals, all disposable materials offsite) at the end of each workday. 7. Contractor shall include all necessary taxes and freight in the bid proposal. 8. Contractor shall provide a one (1) year warranty that applies to all work performed.