Specifications include, but are not limited to: The project consists generally of the following items in accordance with the drawings and specificationspresented in this Project Manual:1.BASE BID. The Payson Park Playground Project includes site improvements associated with aplayground reconstruction project. Work will include, but is not limited to, the following:•All demolition and site preparation work as indicated on the plans.•Earthwork, including preparation of new playground areas, new stone dust area, and minorgrading associated with the existing playground improvements.•Resurfacing of existing stone dust path to remain and constructing new stone dust areas asspecified in the plans.•Placing reclaim granite curbing (provided by City; to be loaded and transported to the site byContractor from the City’s outer Congress Street facility), as indicated on the plans.•Relocating and setting existing landscape boulders on site.•Preparing base aggregate, as required, for new playground equipment (by others) as indicated onthe plans, including any required coordination with the City’s playground equipment installers.•Preparing new planting beds and tree wells (Planting to be done by City), including mulchplacement.•Constructing and repairing lawn areas, including loam, seeding, and mulching.•Modify the existing fence, as required, and provide and install new entrance panels / gates asspecified in the construction documents. Work shall include all required demolition, preparation,hardware, materials, and footings.