Specifications include, but are not limited to: Hang plastic barriers and HEPA filtration during construction as needed to minimize dust, dirt and noise. Contractor will be responsible for tying up or removing and reinstalling all lighting, fire devices, and misc. electronics as needed for the installation of the ceilings in the restrooms. Men's Restroom Demo interior Partition Wall between the Men's Restroom and Locker Room for the installation of ADA Compliant Restroom. Employee Lockers to be removed and reinstalled as needed for the relocation of Partition Wall, and installation of new Ceramic Flooring. Any Lockers that will not fit in new space will be turned over to Owner. Demo interior Restroom Partitions, Specialties, and Fixtures. Demo existing Wall, and Floor Tile. Install new 3-58" Metal Stud Wall with 5/8" Gypsum Board, and Cement Board for installation of Ceramic Wall Tile. Wing Wall Urinal Screen to have Ceramic Tile. Finish Drywall to level 4. Provide and supply new Rough-in for Plumbing Fixtures. Provide and install new Ceramic Floor Tile & Base. Provide and install new Ceramic Wall Tile on Wet Walls, Urinal Screen, and adjacent to Wet Wall. Tile per submittal provided by Owner. Paint above Ceramic Tile (3) Coats. Provide and install (2) new elongated Flush Valve Type Water Closets. (1) to be ADA. Provide and install new Low Use Automatic Urinal. Provide and install new Low Use Automatic Lavatory, (2) EA. American Standard Lucerne Wall Hung. Provide and install new Partitions. Provide and install new Restroom Specialties, Toilet Tissues, Mirrors, and Grab Bars. Soap dispensers to be reused. Provide and install (1) Hollow Metal Cased opening into Locker Area. Painted (3) Coats Paint. Women's Restroom Demo interior Partition Wall between the Men' Restroom, and Locker Room for the installation of ADA Compliant Restroom. Employee Lockers to be removed and reinstalled as needed for the relocation of Partition Wall, and installation of new Ceramic Flooring. Any Lockers that will not fit in new space will be turned over to Owner. Demo interior Restroom Partitions, Specialties, and Fixtures. Demo existing Wall, and Floor Tile. Install new 3-58" Metal Stud Wall with 5/8" Gypsum Board, and Cement Board for installation of Ceramic Wall Tile. Wing Wall Urinal Screen to have Ceramic Tile. Finish Drywall to level 4. Provide and supply new Rough-in for Plumbing Fixtures. Provide and install new Ceramic Floor Tile & Base. Provide and install new Ceramic Wall Tile on Wet Walls, and adjacent to Wet Wall. Tile per submittal provided by Owner. Paint above Ceramic Tile (3) Coats. Provide and install (2) new elongated Flush Valve Type Water Closets. (1) to be ADA. Provide and install new Low Use Automatic Lavatory, (1) EA. American Standard Lucerne Wall Hung. Provide and install new Partitions. Provide and install new Restroom Specialties, Toilet Tissues, Mirrors, and Grab Bars. Soap dispensers to be reused. Remove and reinstall existing First Aid Cabinet.