Specifications include, but are not limited to: Work includes, but is not limited to, the transfer of approximately 43 water services from the existing 6-inch cast iron water main to existing 16-inch ductile iron water main on North Main Street, Salem, NH between the Bluff Street and Main Street intersections. Work shall also include abandonment of existing 6-inch water main, removal of an existing hydrant, temporary paving, permanent trench paving, and surface restoration, where required. Work also includes installation of approximately 30 linear feet of 16-inch zinc coated ductile iron water main and fittings, 50 linear feet of 12-inch zinc coated ductile iron water main and fittings, 12- and 16-inch gate valves, removal of approximately 10 linear feet of 6-inch asbestos cement (AC) water main, and connection to 6-inch AC water main. The Contractor will be required to conduct this work as nightwork. It is the Contractors responsibility to review all local, state, and federal requirements for proper removal of AC pipe.