Specifications include, but are not limited to: A. Waterproofing VIC Basement 1. The Contractor shall provide all safety barriers to keep bystanders out of work areas and at a safe distance. 2. The Contractor shall provide all tools, materials, equipment, and labor necessary to complete the project. 3. The Contractor shall perform the work at Lake Dardanelle State Park, located at 100 State Park Drive, Russellville, AR. 4. The Contractor shall coordinate with the park Superintendent or his designee to schedule all work required to complete the project. All work must be done within sixty (60) calendar days from the date of contract award. Final Inspection of this project is to be done by Mike Lancaster, Construction Maintenance Coordinator. 5. The Contractor shall provide all necessary cover and/or protection of any area(s) that are to be painted over or around to prevent any drips or over spray, or any other flying debris or byproducts from work being performed which includes but is not limited sand and corn cob blasting. 6. The Contractor shall prevent any unnecessary damage to and part of the building. 7. The Contractor shall take all precautions to prevent any damage to landscaping. 8. The Contractor shall clean up and remove all debris, including but not limited to nails, metals, and construction debris each workday. 9. The Contractor shall conduct a thorough clean up at the end of the project. 10. The Contractor shall provide all materials, arrange deliveries, and protect all materials during construction. 11. The Contractor shall re-caulk all control and expansion joints on the upper back deck filling all joints to prevent all water pooling on all joints (approximately 58 lin. ft.). 12. The Contractor shall clean all stone piers and fireplace along with curb by pressure washing with mild chemicals to remove contaminates and loose mortar. 13. The Contractor shall tuck point up to thirty percent (30%) of the square footage of stone in work area on deck and porch.