Specifications include, but are not limited to: THIS PROJECT INCLUDES CONSTRUCTION OF A NEW PRE-ENGINEERED BUILDING ON THE EXISTING CONCRETE SLAB WHERE TWO EXISTING MODULAR STORAGE BUILDINGS HAVE BEEN REMOVED BY THE OWNER, INCLUDING ASSOCIATED ELECTRICAL CONNECTIONS, ETC. HEAT PUMP UNITS WILL BE INSTALLED IN BOTH ROOMS OF THE NEW PRE-ENGINEERED BUILDING. BASE BID TO INCLUDE: • DESIGN, FABRICATION AND ERECTION OF BUILDING BY PRE-ENGINEERED BUILDING MANUFACTURER, INCLUDING INTERIOR DIVIDER WALL, EXTERIOR WALK DOOR, EXTERIOR OVERHEAD DOOR AND INTERIOR OVERHEAD DOOR BETWEEN ROOMS. • MODIFICATIONS TO EXISTING CONCRETE SLAB AS REQUIRED FOR PRE-ENGINEERED BUILDING COLUMN FOOTINGS. • ALL ELECTRICAL WORK AS SHOWN ON ELECTRICAL DRAWINGS · ALL MECHANICAL WORK AS SHOWN ON MECHANICAL DRAWINGS. ADD ALTERNATE #1: INCREASE SIDEWALL HEIGHT OF BUILDING TO 14'-0" ABOVE GRADE TO HEEL OF TRUSS. ADD ALTERNATE #2: ADD STORAGE LOFT AREA AS INDICATED ON PLAN AND AS DESCRIBED ON SHEET A-002.