Specifications include, but are not limited to: Coordinate all activities with Tanana Chiefs Conference or its representatives on site. Coordinate activities with the excavation contractor on site. Provide all traffic barriers and cones as required to perform the repair. Provide photos of the break once the water line has been day lighted. Have on site new 6” pre insulated HDPE on site in sufficient lengths to make repairs without adding stress to the water line. Utilize HDPE repair couplings to repair the break in the 6” HDPE line. Utilize Pro Press fittings to make any repairs in the 1” PEX re circulation line After the repairs have been made, hydro test the 6” and 1” lines for 2 hours at 90 PSI Reconnect the 6” line in the well house and in the crawl space of the UTHC. Coordinate a 12 hour static pressure test with Tanana Chiefs Conference or its representatives on site prior to allowing the pipe to be insulated.