Specifications include, but are not limited to: The work called for in these Bid Documents includes the construction of a new 9,900 GSF two level entry and medical clinic addition on the North side of Benson High School located at 5120 Maple St. in Omaha, Nebraska. The new addition will be a precast concrete clad steel structure with curtain wall that will contain medical exam rooms, dental procedure space, lab space, offices, restrooms, a conference room, mechanical, electrical and data rooms, one passenger elevator, stairwells, concessions, laundry room, circulation, and commons space. Bids are to be completed on the bid form contained in the Bid Documents. A copy of the bid with original signatures by the bidder, including all required information, attachments and exhibits, and including an original bid bond as required in Section 1.2,and the signed Certification (Exhibit B) are to be submitted to the District in accordance with the requirements of the Bid Documents.