Specifications include, but are not limited to: • Sawcut concrete floor in basement to install steel column footings per Davey Associates INC drawings. • Remove cut concrete floor from basement. • Excavate soils to form and pour column footings per Davey Associates INC drawings. • Form and pour concrete footings set column anchor bolts per Davey Associates INC drawings. • Temporarily remove electrical conduits from ceiling for beam installation. • F&I columns, beams and plates per Davey Associates INC drawings. • Replace and finish concrete at basement floor column footings. • Sawcut Concrete apparatus floor. • Remove and dispose of concrete apparatus floor. • Remove and dispose of concrete approach apron. • Remove unsuitable soils below slab according to Allstate Drilling report. • Excavate front apron pad in front of the three bays and compact soils. • Import structural fill below slab in 12” lifts and compact to 95%, and tested. • Replacement of existing floor drains to include all necessary piping. • Install 15ml vapor barrier below apparatus floor slab. • Install #5 rebar reinforcing at 16” oc each way from the center of concrete slab. • Place and finish 6” concrete slab on grade at apparatus floor. • Install Galvanized edge angle in apparatus slab on grad at apparatus apron. • Place and finish 6” concrete slab on grad at apparatus apron • Prepare apparatus floor for epoxy coating. • Apply epoxy coating to floor in color RED – 3/16 Thickness. • Prepare and paint steel installed in basement. • Reinstall electrical conduits at bottom of steel beam. • Provide Materials testing for the following items • Proctor/sleeve analysis for soils to meet RIDOT standards. • Compaction testing for each 12” lift placement of structural fill below slab. • Concrete Cylinder testing for proper PSI