Specifications include, but are not limited to: Scope of work includes the installation of an existing bridge strand jacking system connected to the suspension span tower and top chord of stiffening truss, at the east tower, southeast compression link, to temporarily support and relieve load from the existing compression link assembly. Temporary removal of existing compression link pin nuts is required to provide access to the Engineer to observe conditions of the gusset and reinforcing pin plates. The compression link is to be returned to its original condition with both nuts replaced. Optional work may include the repair of existing gusset/reinforcing pin plates and pin replacement. Work is to be performed at the direction of the Engineer under Time and Materials in accordance with RIDOT Time and Materials measurement and payment. Work also includes provision for maintenance and protection of traffic (MPT).