Specifications include, but are not limited to: The Work consists of the construction of replacement of existing lighting control system with new lighting control panels, lighting control devices and lighting control cabling throughout the entire building including the installation and installation of 1st floor new light fixtures and associated supporting cables and power accessories, Construction includes all administrative work as outlined in the Division 01 General Requirements and the following using materials noted on Drawings and Specifications: Installation of new lighting control panels, lighting control devices and lighting control cabling throughout the entire building pus the installation of the first floor new light fixtures, associated supporting cables and power accessories, commissioning of the lighting control panels, connection to the Building Management System and the commissioning/programing of the lighting analytics system. Power connections for a complete system including conduit, boxes, and conductors to support the new equipment. Connection of the lighting control panels and analytics system to the building LAN/WAN system. Repairing and painting/patching of all ceilings and walls and replacement of damaged ceiling tiles shall be completed to repair the existing spaces back to their original condition. Material storage shall be limited to on site storage containers, provided by the contractor and coordinated with engineer/Real Property Management Design & Construction.