Specifications include, but are not limited to: Provide all materials, equipment, labor, coordination, and supervisory activities necessary to complete construction of the project as outlined. Replacement pipe will be 550 ft of schedule 40 galvanized, new Mechanical tees Vick’s or weldless. And hangers as needed. There are 5 sections of Pipe to be replaced. 1. G2 a. Starting at the Madison Ave. Exit b. continuing for 300 feet c. Marked with white pain at both ends. d. 22 T clams e. 2 Blow down clamps. 2. G2 a. At the Madison b. 30ft 2 in pipe that was hit by car going out. c. No sprinkler heads or fittings d. Connects sprinkler heads in dumpster cabinet. 3. G3 Section 1 a. In the middle between elevator shafts. b. 90 ft c. Marked with white pain at both ends. d. 7 T Clamps 4. G3 a. East end in Infront of doors to the lobby. b. 110 Ft c. Marked with white pain at both ends. d. 6 T clamps e. 3 Single Clamps 5. Large vehicle bay just inside the exit on Madison a. Is on a very high ceiling. b. 20ft c. 2 T clamps d. Is not marked with wight paint. e. Replace the whole stick that has one compression clamps. Remove and recycle all removed pipe. Return the Pressure clams to the Parking Authority All work will meet or exceed the NFPA Standards