Specifications include, but are not limited to: The Scope of Work for this contract consists of the fabrication, supply, and delivery of various steel assemblies associated with the construction of a 26’ I-beam bridge span as specified in the attached Alaska Railroad Corporation Bridge 148.3 N. Approach Span Replacement drawing set dated March 17, 2023. An awarded Fabricator must possess a current American Institute of Steel Construction (AISC) Quality Certification for Major Steel Bridges and a Fracture Critical Endorsement. The bid award is contingent upon receiving proof of current AISC certifications. A pre-fabrication tele-conference meeting shall occur before commencing any fabrication Work. The meeting shall include, at a minimum, the Fabricator’s Project Manager, the Fabricator’s Shop Supervisor, the Fabricator’s Quality Assurance/Control Manager, the Owner’s Quality Assurance representative, and the Owner to include it’s designated representatives. The Fabricator shall accommodate the Quality Assurance efforts of ARRC, or its designee, at the Fabricator’s facilities and/or the facilities of any subcontractors utilized by the Fabricator.