Specifications include, but are not limited to: Scope of work includes all administrative work as outlined in the Division 01 General Requirements and the following using materials noted on Drawings and Specifications: the project consists of the design and construction of an approximately 544 sq. ft. new CMU pump house/pool equipment room. Scope of work includes demolition of the existing structure, abatement of asbestos required, and replacement with a new structure including appurtenances, concrete, masonry, metals, thermal moisture protection, openings, finishes, specialties, plumbing, electrical and exterior improvements. Scope also includes the removal, protection, and reinstallation of the new pool equipment