Specifications include, but are not limited to: Contractor shall provide all labor, materials, equipment, tools, bonding and insurance, and supervision necessary to perform the HVAC Replacement as specified in Attachment B – Specifications. All work not specified and/or not shown, but which is necessary for the completion and/or functioning and operation of the project, shall be understood and implied as part of the contract to be performed by the Contractor for the contract price. Such work shall be executed by the Contractor in the same manner and with the same character of material as other portions of the contract without extra compensation. 4.1. Service Requirement: Services shall include, but are not limited to, the requirements contained in this IFB. Services set forth that contain the words “must” or “shall” are mandatory and must be provided as specified with no alteration, modification, or exception. Services set forth that contain the words “may” or “can” allow Bidders to offer alternatives to the manner in which the commodities/services are provided. Awarded bidder must meet IFB criteria listed under Section 5 Minimum Qualifications. The requested services and corresponding deliverables are as follows: 4.1.1. Furnish all labor, tools, equipment, materials, and incidentals to [insert requirements]. 4.1.2. Jobsite must be cleaned daily so as not to disrupt employees or normal operations of affected area(s). 4.1.3. Upon completion of the work, area will be clean, and all debris accumulated will be removed from the jobsite. 4.1.4. Upon final acceptance of the work by TPWD, the Contractor shall furnish to TPWD the maximum available manufacturer’s warranty on all installed products. Material and labor on installation shall be warranted by Contractor for a period of one-year.