Specifications include, but are not limited to: Install Street Light Electrical Conduit, including trenching, backfill, and repair of the street, curb, and drive aprons.; Install Irrigation Piping, including 4" and 2" conduits, pipe fittings, valves, trenching away from electrical, backfill, asphalt removal, saw cutting, and street repair. Spacing away from the electrical.; Install Tree Bubbler and Riser Assemblies, including 4" perforated PVC pipe with pea gravel.; Prepare Tree Reservoir, Remove Existing Soil, and Add Soil Mix and Root Barrier.; Install Street Light Foundations, including drilling piers and rebar.; Cut Out and Remove Concrete/Soil.; Install Sod Including 12" of Top Soil.; Install ADA Ramps, including Class 7 base.