Specifications include, but are not limited to: The scope of work for the Carson River Trail System Phase III – Prison Hill WestProject will cover the following as a minimum:The project deliverables include, but are not limited to plans, specifications andbiddocumentsforthelayoutanddesign,engineering,permitting,andconstruction of a non-motorized multi-use trail about 2.5 miles in length, trailhead improvements, and street crossing improvements, for the Carson River Trail System Phase III: Prison Hill West (refer to attachment C-1, C-2, C-3)Design elements:•Plans and specifications for a Ten (10) foot wide trail with 2-footshoulders, approximately 2.5 miles in length, to include: oTrail will be unpaved, constructed with structural material, and include a compacted decomposed granite surface. oRock slope protection as necessary on side slopes greater than2:1.