Specifications include, but are not limited to: qualified Construction Management firms for the construction of new Windgate Hall. The new Art & Innovation facility is a steel framed structure to house spaces supporting learning and creative activities for Art & Design as well as Engineering and Computer Sciences at ASU. Comprised primarily of studio spaces, the building will also feature a slopped floor lecture classroom, printing / fabrication workshop, computer classrooms, faculty offices, and a café space. Substantial use of high-performance glazing with low iron glass (both exterior and interior) will enhance use of daylighting and encourage visual awareness and collaboration of creative endeavors throughout the building. The total heated and cooled space is anticipated to be approximately 43,000 GSF. • Participate in program design charrette meeting, providing input as needed • Preconstruction services of constructability and project cost estimating / pricing at Schematic Design, Design Development, and 90% Construction Documents. o All cost estimates / costing is expected 1-week post delivery of architectural team documents. The project schedule will therefore require very close communications / coordination with the owners and design team to ensure timely and accurate estimates / costs. o Provide input on project scope phasing to ensure schedule objectives are achieved. o Provide Value Alternatives / Value Engineering in timely fashion to ensure project budget objectives are achieved / maintained. CM is responsible for alternative products / materials and construction methods. • Input for early construction packages to expedite project delivery (for example, demolition, early framing).