Specifications include, but are not limited to: 1. The building has an EPDM rubber membrane roof system. 2. On the roof, there are existing roof top units, makeup air units, heating units, exhaust fans, vent pipes, natural gas pipes, electrical conduit, etc. 3. The contractor must remove the existing metal roof edging and fascia and replace with new. Color will be selected after the contract has been awarded through the submittal process. 4. The contractor must remove the existing parapet coping and replace with new. Color will be selected after the contract has been awarded through the submittal process. 5. The contractor must only remove the amount of roofing that can be replaced back the same day. Contractor is responsible for securing all roof areas during construction. Contractor will be responsible for any damages caused from water leaks in any areas that are not watertight secured.