All correspondence must be made through the Vendor Portal. Specifications include, but are not limited to: Work under this contract shall include all labor, materials, equipment, tools, utility abandonment, transportation services, landfill fees, and all incidentals necessary for the completion of the demolition covered by the contract documents. The property has not been tested for asbestos and should be considered contaminated. The property is not safe to enter; you may view the exterior at your own risk. Completion for the projects shall include the removal of all equipment, construction debris and materials; This item shall include all labor, equipment and material necessary to excavate, abandon water and sewer service lines to the designated property, backfill, and restore existing pavement, sidewalk, driveway, or earthwork.