Specifications include, but are not limited to: 1. PRIOR TO COMMENCING DEMOLITION WORK, CONTRACTOR SHALL VERIFY LOCATIONS OF ALL EXISTING UTILITIES AND MAKE PROVISION THAT NO INTERRUPTION OF SERVICES OCCUR. COORDINATE ANY SERVICE INTERRUPTIONS WITH OWNER'S REPRESENTATIVE. 2. ALL MATERIALS NOT REQUIRED TO BE REMOVED FOR THE EXECUTION OF THE PROJECT SHALL BE LEFT IN PLACE AND PROTECTED FROM DAMAGE DURING DEMOLITION. ANY ITEMS DAMAGED DURING DEMOLITION SHALL BE RESTORED TO THEIR ORIGINAL CONDITION AT THE CONTRACTOR'S EXPENSE. 3. THE OWNER ASSUMES NO RESPONSIBILITY FOR ACTUAL CONDITIONS OF ITEMS TO BE DEMOLISHED. 4. CUT AND REMOVE/REPLACE ALL PORTIONS OF EXISTING CONSTRUCTION AS REQUIRED TO ALLOW ACCESS TO ITEMS NOTED FOR DEMO AND FOR PROPER INSTALLATION OF NEW CONSTRUCTION. 5. AT ANY TIME DURING DEMOLITION, IF ANY CONTRACTOR DISCOVERS HAZARDOUS MATERIALS, STOP WORKING AND NOTIFY THE OWNER AND ARCHITECT IMMEDIATELY. 6. ALL DASHED LINES ON DEMOLITION DRAWINGS INDICATE ITEMS TO BE REMOVED. REFER TO GENERAL DEMOLITION NOTE 4 FOR ALL INSTANCES NOT DESIGNATED BUT NECESSARY TO ALLOW PERFORMANCE OF SCOPE OF WORK SHOWN. 7. ALL DEMOLITION MUST REMAIN INSIDE CONSTRUCTION LIMITS AS SHOWN, U.N.O. 8. NEATLY CUT OPENINGS AND HOLES PLUMB, SQUARE, AND TRUE TO DIMENSIONS REQUIRED. USE CUTTING METHODS LEAST LIKELY TO DAMAGE CONSTRUCTION TO REMAIN/ADJOINING CONSTRUCTION. 9. CONTRACTOR SHALL COMPLETELY REMOVE ALL DEMOLISHED MATERIALS FROM THE SITE UNLESS REQUESTED OTHERWISE BY THE OWNER. ALL DEMOLISHED MATERIALS WILL BECOME PROPERTY OF THE CONTRACTOR, UNLESS THEY ARE TO BE REUSED OR OTHERWISE NOTED / INSTRUCTED, AND SHALL BE DISPOSED OF LEGALLY. CONTRACTOR SHALL REMOVE DEBRIS, RUBBISH AND OTHER MATERIALS FROM THE CONSTRUCTION SITE ON A DAILY BASIS. CONTRACTOR SHALL COORDINATE DUMPSTER LOCATION AND ACCESS WITH THE OWNER.