Specifications include, but are not limited to: • St. Armand Rd. - from Gagne Road to Campagna Rd, approximately 5,700 feet. 1,000 feet starting at Gagne Road will need a 0.75 shim, and the total 5,700 feet will need a 1.5-inch overlay. All of the road is 22 feet wide. • Durkee Rd- from Hanna Road Intersection to end of pavement, approximately 1,200 feet long by 22 feet wide. All a 0.75-inch shim and 1.5-inch overlay. • Rainville Road- from Gore Road to the end of pavement, approximately, 1,200 feet long will all need just 1.5-inch overlay, no shim. The road is 22 feet wide for 1,800 feet from Gore Road and then the remaining 1,700 feet are 18 feet wide. • Machia Rd- from the B-25 Bridge to #2221, approximately 1 mile long by 22 feet wide. 0.5-inch shim and 1.5-inch overlay (this road segment is pending grant approval).