Specifications include, but are not limited to: Work shall include, but not limited to the following items necessary to relocate WGLT to a more public location, improve the functionality of their working space, while combining the WGLT group with the Daily Vidette staff and students. Updating the space will provide, four walled offices, five studios, conference room, break room, along with open office space. New office furniture will be furnished by ISU for offices, open area, and studios. General Contractor should demo existing space per the documents, build new privacy/sound walls for designated new studios, which will include STC rated doors, glazing and hardware, new offices, conference room and server room for all WGLT equipment. In areas of construction, existing and new walls will require paint, new grid/acoustical ceiling tile, lighting, and flooring, as per the documents. Electrical scope will include demo, temporary lighting, power and data, dimming LED and track lighting in designated areas, fire safety, new electrical panel, manual transfer switch. HVAC scope will include demo, furnish new grills, registers, diffusers and connecting ductwork, relocation of thermostat(s), furnish and install new temperature control unit for server room, and test and balance all mechanical systems. Plumbing scope to remove existing hose bibb, per the documents. This project will include general construction, electrical, HVAC, flooring, and plumbing. Disposal of all removed construction debris, dumpster, clean up daily, final construction clean, submittal and closeout documents.