Specifications include, but are not limited to: Installation of sanitary and storm sewer to improve and separate existing West Hill combined sewer system. Work will be constructed under a single unit price Contract. The work is divided into multiple stages to be completed over two years 2023 and 2024, according to the Contract Times defined in the Contract. Work includes water main and electric improvements in the Phase 6A and 6B project area. Phase 6A and 6B work includes general construction of approximately 3,350’ of new 8” sanitary sewer on East Ninth Street, East 10th Street, Sycamore Street, and Fulliam Avenue. In addition, it includes the continuation of the new West Side Interceptor with approximately 2,520’ of 18” and 24” sanitary sewer. Approximately 1,900’ of new storm sewer, inlet piping and inlets are included. Approximately 900’ of trenchless construction is included. Water main replacement includes approximately 1,750’ of new 6”, 8”, and 10” main and installation of electrical conduit for future overhead to underground electrical conversion. All sub-phases include the following work: sanitary service connections, new inlets, inlet piping, full-width pavement removal and replacement, sidewalk construction, seeding, and other related work. 1 TREE REMOVAL 33 EA; 2 CLEARING AND GRUBBING 1 LS; 3 TOPSOIL OFF-SITE 727 CY; 4 TOP SOIL OFF-SITE, OWNER PROVIDED 727 CY; 5 CLASS 10 EXCAVATION 3043 CY; 6 CLASS 13 EXCAVATION - RR TIE REMOVAL AND DISPOSAL 120 TONS; 7 GRANULAR SUBBASE - 6" (UNDER ROADWAY PAVEMENT) (CONTRACTOR PROVIDED) 10521 SY; 8 GRANULAR SUBBASE - 6" (UNDER ROADWAY PAVEMENT) (CITY FURNISHED CRUSHED CONCRETE) 7085 SY; 9 SPECIAL BACKFILL - CONTACTOR PROVIDED MATERIAL - 6" (UNDER DRIVEWAY/ALLEY) 2888 SY;