Specifications include, but are not limited to: This project consists of the removal, upsized replacement, and addition construction of approximately 2500 LF of storm sewer system. Replacement items include 18" to 54" RCP pipes, manholes, inlets, junction boxes, outfall structure modifications and riprap basin. The project also includes related efforts of removal and replacement of sidewalk and asphaltic pavement, water main and service lowering and relocation, and fire hydrant relocation. . Traffic Control . Contractor Construction Staking . Project Sign Type B . Clearing and Grubbing . Concrete Washout Station . Remove and Reset Mailbox . Remove and Replace 8" Asphaltic Concrete Pavement . Removal of Large Trees . Remove and Replace 10" Asphaltic Concrete Pavement . Remove and Replace 8" Concrete Pavement . Remove and Replace Combined Curb and Gutter, Type I . Remove and Replace 6" Concrete Driveway . Remove and Replace 5" Concrete Sidewalk, 4 FT Wide