Specifications include, but are not limited to: , preliminary design, design development, schedule and cost estimating, complete construction documents, contractor procurement, and construction administration for new, replacement shower buildings and other utility upgrades at Range Pond and Sebago Lake State Parks. The Owner prefers to select one A/E firm for both park locations through this RFQ process. The selected firm will be responsible for creating separate bid packages for each location. The Owner intends to issue the bid packages at approximately the same date. Notable design and engineering tasks in the project include the following: 1. Range Pond State Park: • New central bath house with 16 single-user restrooms • Including an additional changing area • Removal of existing bathhouse • Provide options for photovoltaic panels and/or solar thermal • Upgrades/repairs to group shelter • New equipment storage building • Utility upgrades including underground power • Replace / Reconstruct beach walkway and retaining wall 2. Sebago Lake State Park: • Four new central bath houses with 8 single-user restrooms • 5 Showers / 3 bathrooms only / mechanical room/storage • Removal of existing bathhouses • Provide options for photovoltaic panels and solar thermal • New 40 - 60 person visitor center • With accessible parking • Add electrical and water hook-ups on some existing sites, where practical • Add wireless connectivity throughout the park • New storage building • Improve visitor and trailer parking • Resurface boat launch • Upgrade/repair amphitheater • New campground entrance booth