Specifications include, but are not limited to: -8" Micro Fiber Reinforced Dowel-Jointed PCCP with Aggregate Base Course: State the amount per square yard (SY) for constructing 8" Micro Fiber Reinforced Dowel-Jointed PCCP, including subgrade compaction, 12" KDOT AB-1 aggregate base course, dowelled joints and concrete (excluding curb and gutter). Base bid shall include all new 8" micro fiber reinforced dowel-jointed PCCP with aggregate base course as shown on the plans. 6” asphaltic base course (KDOT BM-2B): State the amount per square yard for installing 6-inch base course. 2” milling existing pavement: State the amount per square yard (SY) for milling 2” of existing pavement. 2” asphaltic surface course (KDOT BM-2): State the amount per square yard (SY) for installing 2-inch asphaltic surface course. 2'-0" Curb and Gutter Section with Aggregate Base: State the amount per lineal foot (LF) for constructing 2'-0" curb and gutter as detailed on plans. Base bid shall include all new curb and gutter as shown on the plans. 5.5" Micro Fiber Reinforced Concrete Sidewalk with Aggregate Base Course: State the amount per square yard (SY) for constructing 5.5" micro fiber reinforced concrete sidewalk. Base bid shall include all new 5.5" micro fiber reinforced concrete sidewalk with aggregate base course as shown on the plans. Sidewalk demolition: State the amount per square yard (SY) for the removal and disposal of concrete sidewalk and aggregate base. Base bid shall include all sidewalk demolition as shown on the plans.