Specifications include, but are not limited to: 1. Provide all labor, materials and equipment to perform repairs, alterations, and new installations of the doors at each of the sixteen (16) maintenance, welcome center, and toll facilities during normal business hours. Doors can consist of, but not limited to security key punched doors, fire egress doors, handicap doors with openers, standard interior and exterior doors, tollbooth doors, overhead/garage bay doors, sliding doors and safety glass doors. Should specific doors fall outside of the contractor’s expertise, subcontractors may be used with a pass-through labor cost and standard percentage markup on materials as specified in the compensation section as stated below. See the attached location list (Exhibit A). 2. Perform emergency repairs to the doors at each of the sixteen (16) maintenance, welcome center, and toll facilities, as directed by the DEPARTMENT. Upon notification of a deficiency, the CONTRACTOR will respond to the affected site within twenty-four (24) hours and complete the repairs within forty-eight (48) hours of notification. 3. The CONTRACTOR shall coordinate with the Bureau of Turnpikes Maintenance Mechanic Foreman for repairs, alterations and new installations to the doors at each of the sixteen (16) maintenance, welcome center, and toll facilities, during normal business hours, 7:00 am to 5:00 pm, Monday thru Friday, unless otherwise directed by the DEPARTMENT. 4. The CONTRACTOR shall make recommendations pertaining to the door design that affects the ability of the building to meet the stated goals and objectives of all governing codes and standards and the authority having jurisdiction.