All correspondence must be made through the Vendor Portal. Specifications include, but are not limited to: 0005 201001-000 CLEARING AND GRUBBING LUMP SUM LUMP SUM _________._____ 0010 204001-000 MOBILIZATION LUMP SUM LUMP SUM _________._____ 0015 207001-001 UNCLASSIFIED EXCAVATION CY 6,110.000 _________._____ _________._____ 0020 207002-000 SUBGRADE CY 788.000 _________._____ _________._____ 0025 207034-000 FABRIC FOR SEPARATION SY 4,620.000 _________._____ _________._____ 0030 211002-000 ROCK BORROW EXCAVATION CY 223.000 _________._____ _________._____ 0035 217001-000 SPECIAL ROCK FILL CY 270.000 _________._____ _________._____ 0040 307001-000 AGGREGATE BASE COURSE, CLASS I CY 608.000 _________._____ _________._____ 0045 307001-000 AGGREGATE BASE COURSE, CLASS III CY 60.000 _________._____ _________._____ 0050 307001-000 AGGREGATE BASE COURSE, CLASS 10 CY 675.000 _________._____ _________._____ 0055 408002-001 ASPHALT MATERIAL GA 101.000 _________._____ _________._____ 0060 415005-001 STANDARD MILLING SY 878.000