Specifications include, but are not limited to: realign, upgrade and improve a combined 2840-linear feet of W Forest Lake Drive and S Forest Park Drive. This project will involve, but is not limited to, clearing, grubbing, excavation, import and placement of borrow material, installing drainage culverts, and placing topsoil and seed.; All construction shall be completed in accordance with the Alaska Department of Transportation and Public Facilities (DOT&PF) Standard Specifications for Highway Construction (SSHC) 2017 Edition. Project specific special provisions are provided in the following sections. The requirements contained in these specifications and special provisions are hereby made a part of this solicitation and resultant contract. This project is in Houston, AK along W Parks Hwy. The project may be accessed by heading west 17.1 miles on the Parks Highway. See project location and vicinity maps. Contractor is to provide resources to complete this project without any adjustments in the original bid amount or contract time. Contractor shall coordinate the road improvements with all utility relocation work. Request locates from the utilities having facilities in the area. Use the Alaska Digline, Inc. Locate Call Center. See Section 105-1.06 for digline number and a list of utility companies in the area. Work Zone speed limit: Limit speed of vehicles associated with construction to 20 miles per hour within project limits. Contractor shall complete ROW and utility easement staking and clearing and all necessary SWPPP items for utility relocation support upon NTP. This work shall be included in items 201(3B), 641(1), 641(3), and 642(1). Additional stump removal for utility support will be directed if needed and is not included in these items. The anticipated additional utility support areas are as follows: o STA. 21+14 @ 20 RT Pole to be relocated.