Specifications include, but are not limited to: Contractor will provide a complete water treatment program that will protect critical equipment and piping from deterioration due to corrosion and fouling of waterside surfaces while allowing this equipment to operate at optimum efficiency. Contractor shall furnish effective products, quality service in a timely manner and good communications, all designed to meet the performance expectation outlined in this specification and jointly agreed upon. Contractor will provide all labor, chemicals, materials, test kits and coupons, necessary to chemically treat and maintain the total water chemistry for all boilers, water heaters, cooling towers and open and closed circulating water systems at the Providence R.I. Capitol Hill Complex, Cranston St. Armory and Eleanor Slater Hospital Zambarano Unit heating plant. This must ensure a proper and safe, dependable operating condition for maximum safety and operating efficiency. Contractor shall measure and verify all capacities and noted condition, sizes, types of all equipment and conditions at job site, as he will be responsible for the proper chemical supply, testing and analysis reports. Contractor is to provide all the necessary chemicals to clean each cooling tower at the end of the cooling season and to properly lay up the systems at the end of the cooling season.