Specifications include, but are not limited to: The proposed work for the 2023 Roadway Improvements consists of road related construction and paving along several roads in Town as further described in these documents. Major items of work include; replacement and installation of drainage and underdrainage; asphalt reclamation (resulting in stabilized road base), grading and compacting, hot mix asphalt resurfacing of roads, drainage and underdrainage installation; shouldering, traffic control, and all appurtenant work in accordance with the Specification and Contract Documents. In addition to the specifications included in these documents, all construction methods and materials shall conform to the New Hampshire Department of Transportation Standard Specifications for Road and Bridge Construction (latest version).