Specifications include, but are not limited to: This specification contains requirements pertaining to the supply and delivery of parts for Infilco Degremont "Climber Screen" Mechanical Bar Screen - Model IIS to the Camden County MUA Facility, 200 Jackson Street, Camden, New Jersey 08104. 2.1 Workmanship shall be in accordance with high grade commercial practice governing these types of parts. All parts specified herein shall be manufactured in accordance with the original manufacturer’s material specification, tolerances and design. In the event that the original manufacture has upgraded or otherwise improved their original design, the parts shall be of the improved design of the original manufacturer, or an equivalent as approved by the Authority. 2.2 The parts shall be delivered with all specified components included. Complete manuals will be supplied at the time of delivery. 2.3 These specifications are meant to be complete and informative. They are not assumed to be all inclusive. All items required to make a complete, finished, working unit must be included whether specified or not. If a bidder has questions about the specifications, the questions should be addressed in writing to the CCMUA in advance of the bid opening. Responses, in writing, will be made available to all bidders. 2.4 The specified manufacturer and model of Infilco Degremont “Climber Screen” Mechanical Bar Screen and the terminology used herein may include reference to this manufacturer’s proprietary products. Such reference shall be construed only as establishing the quality of materials and workmanship to be used under this section and shall not, on any way, be construed as limiting competition. Any exception or deviation from the specifications and/or the features of the specified Infilco Degremont “Climber Screen” Mechanical Bar Screen or from the Authority specification must be clearly identified and spelled out in writing and submitted with the bid form. Inclusion of the manufacturer’s literature, cut sheet, etc. may be used to further explain the exception or deviation but a written description of the exception or deviation must always be supplied at the time of the bid. Failure to include a written list of exceptions or deviations from the specifications and /or the features will be a basis for finding the bidder to be non-responsive.