Specifications include, but are not limited to: The Vendor will be responsible for all labor and material for the placement of the new batteries per industry standards using No-Ox grease at each point of terminal connection as well as safe transport and handling of the batteries during installation. They will insure that the batteries they quote fit in the existing, 19, and 23-inch racks that are currently on site at each location. They will be responsible for the haul off and proper disposal of the used batteries and will provide AREON with documentation from the disposal site. The batteries quoted will be pre-charged and ready for operations at the time of install. AREON will provide a representative to escort the contractor to each site and will supervise the installation. Each of the strings at the sites has a separate disconnect device that will isolate that string while work is being performed. There will be no need for the contractor to provide a temporary 48volt DC power feed while work is being completed.