Specifications include, but are not limited to: The CONTRACTOR shall provide all management, tools, supplies, equipment and labor necessary to maintain equipment listed. OFFSET PRINTING PRESS 2 TIMES ANNUALLY . ENVELOPE PRESS 2 TIMES ANNUALLY . ENVELOPE FEEDER ANNUALLY . Description of Equipment not on the Preventive Maintenance Schedule *Folder, ProFold, Elite 500 *Numbering/Perforating Machine, Graphic Wizard, GW8000P *Tabber, Accufast, KT24795 *Shrink Wrap System, APS VT 16-8-18 *Punch, Spiral and Wire Bind, Rhino, HD7700 – 2 each *Silver Master Maker, Escofot *Tape binder, Powis Parker, Fastback 15X *Coil Inserter, electric, Roll-A-Coil *Stapler, Stitch Master *Stapler, Interlake, S3A * Townsend T-Head, T-Head 9810